Arbitrary Unit 506, not further specified

About this Nonstructure

No Surface
No Masonry

General Location

Northwest portion of the site.

Specific Location

Arbitrary 506 is about 80 m northwest of Structure 102.

Selection Criteria

A 1-x-1-m unit was used to investigate a midden deposit. It was discovered that a pit structure existed under the midden deposit, so a 3-x-1-m unit was used to investigate the structure.

Use

Arbitrary 506 is a post-occupational deposit.

Abandonment

Not Applicable

Postabandonment Process

Arbitrary 506 was deposited through natural processes (wind and water).

Dating of Construction

Not applicable.

Dating of Remodeling

Not applicable.

Dating of Abandonment

Not Applicable

Dating of Midden

Basketmaker III (A.D. 600-725).

Dating of Reuse

Not applicable.

Date Range

4 (A.D. 600–725)

Site-Wide Dating

Excavation Details for Excavation Units

In order by excavation unit number.

Excavation Unit

163

Location

1-x-1 meter grid unit 1470N 430E.
Northwest quarter of the site.
Located directly west of the center of the Nonstructure 502 (Architectural Block 500 midden), over Structure 505.

Selection Criteria

Random. To sample Architectural Block 500 midden Nonstructure 502.

Excavation Strategy

Strata subdivided into arbitrary levels. Strata were subdivided into arbitrary 10-cm levels when applicable.

Unit Ends at

Structure floor. Excavations ended on the floor of Structure 505 at an elevation of approximately 100.84 m. Features 1 and 2 were dug into the Structure 505 floor.

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Nonstructure
502
midden
Structure
505
earth-walled pit structure
Arbitrary Unit
506
not further specified

Excavation Unit

189

Location

1-x-3 meter grid unit, long axis oriented north-south 1467N 430E.
Northwest quarter of the site.
Located directly west of the center of the Block 500 midden, over Structures 505 and 508.

Selection Criteria

Judgmental. This unit was selected to test Structures 505 and 508.

Excavation Strategy

Natural strata.

Unit Ends at

Structure floor. In the north section of the unit, excavation ended on the floor of Structure 505 at an elevation of approximately 100.84 m. In the south section of the unit, excavation ended on the floor of Structure 508 at an elevation of approximately 100.79 m.

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Structure
505
earth-walled pit structure
Arbitrary Unit
506
not further specified
Nonstructure
507
midden
Structure
508
earth-walled pit structure