Backhoe Trench 230, not further specified
About this Nonstructure
General Location
Central portion of site.
Specific Location
Northwestern portion of Block 200; excavated directly south of Backhoe Trench 216.
Selection Criteria
North-south oriented backhoe trench excavated to expose Structure 221 boundaries.
Use
Not applicable.
Abandonment
Not applicable.
Postabandonment Process
Not applicable.
Dating of Construction
Not applicable.
Dating of Remodeling
Not applicable.
Dating of Abandonment
Not applicable.
Dating of Midden
Not applicable.
Dating of Reuse
Not applicable.
Date Range
14 (A.D. 7711258)
Site-Wide
Dating
Excavation Details for Excavation Units
In order by excavation unit number.
Excavation Unit
307
Location
Whole study unit N E.
Central portion of site.
Northwestern portion of Block 200; excavated directly south of Backhoe Trench 216.
Selection Criteria
Judgmental. North-south oriented backhoe trench excavated to expand boundaries of Structure 221.
Excavation Strategy
Full cut.
Unit Ends at
Fill continued. Fill continued below Backhoe Trench 230 into Structure 221.
Study Unit(s) Identified in this Excavation Unit