Backhoe Trench 231, not further specified
About this Nonstructure
General Location
Central portion of site.
Specific Location
Northwestern portion of Block 200; excavated directly south of Backhoe Trench 217.
Selection Criteria
North-south oriented backhoe trench was excavated to expand the exposure of Structure 222.
Use
Not applicable.
Abandonment
Not applicable.
Postabandonment Process
Not applicable.
Dating of Construction
Not applicable.
Dating of Remodeling
Not applicable.
Dating of Abandonment
Not applicable.
Dating of Midden
Not applicable.
Dating of Reuse
Not applicable.
Date Range
14 (A.D. 7711258)
Site-Wide
Dating
Excavation Details for Excavation Units
In order by excavation unit number.
Excavation Unit
309
Location
Whole study unit N E.
Central portion of site.
Northwestern portion of Block 200; excavated directly south of Backhoe Trench 217.
Selection Criteria
Judgmental. North-south oriented backhoe trench was excavated to expand exposure of Structure 222.
Excavation Strategy
Full cut.
Unit Ends at
Fill continued. Fill continued below Backhoe Trench 231 into Structure 222.
Study Unit(s) Identified in this Excavation Unit