Backhoe Trench 232, not further specified
About this Nonstructure
General Location
Central portion of site.
Specific Location
Northwestern portion of Block 200; north edge abuts south edge of Backhoe Trench 219.
Selection Criteria
Excavated to facilitate access to Structure 224 Segments 1 and 2, and to remove upper fill and plow zone for additional excavation within Structure 224; no additional excavation was conducted beyond the base of Backhoe Trench 232.
Use
Not applicable.
Abandonment
Not applicable.
Postabandonment Process
Not applicable.
Dating of Construction
Not applicable.
Dating of Remodeling
Not applicable.
Dating of Abandonment
Not applicable.
Dating of Midden
Not applicable.
Dating of Reuse
Not applicable.
Date Range
14 (A.D. 7711258)
Site-Wide
Dating
Excavation Details for Excavation Units
In order by excavation unit number.
Excavation Unit
315
Location
Whole study unit N E.
Central portion of site.
Northwestern portion of Block 200; north edge abuts south edge of Backhoe Trench 219.
Selection Criteria
Judgmental. Excavated to facilitate access to Structure 224 Segments 1 and 2, and to remove upper fill and plow zone for additional excavation within Structure 224; no additional excavation was conducted.
Excavation Strategy
Full cut.
Unit Ends at
Fill continued. Backhoe trench ended when plow zone and natural fill had been removed. Fill continued into Structure 224, but was not excavated.
Study Unit(s) Identified in this Excavation Unit