Nonstructure 227, extramural surface

About this Nonstructure

Has Surface
No Masonry

General Location

Southeast portion of the site.

Specific Location

Nonstructure 227 is the use-surface around Structure 220-234.

Selection Criteria

Excavation units were used to investigate a remote-sensing anomaly.

Use

Nonstructure 227 is the exterior use-surface surrounding Structure 220-234.

Abandonment

Post-Basketmaker III.

Postabandonment Process

Middeen Nonstructure 215 was deposited over Structure 220-234 by cultural means; Arbitrary 214 was deposited over Nonstructure 215 and 227 through natural wind and erosional processes.

Dating of Midden

Basketmaker III period (A.D. 600-725).

Date Range

2 (A.D. 600–660)

Site-Wide Dating

Excavation Details for Excavation Units

In order by excavation unit number.

Excavation Unit

25

Location

2-x-2 meter grid unit 1369N 502E.
Southeast portion of site.
Directly west of Block 200 east midden.

Selection Criteria

Judgmental. To sample fill above Structure 220 and to identify Structure 220 outline.

Excavation Strategy

Natural strata.

Unit Ends at

Other. The purpose of Excavation Unit 25 was to identify the outline of Structure 220. Excavation Unit 25 was terminated when a small portion of Structure 220 was located in the northeast corner of the Excavation Unit. The remainder of Excavation Unit 25 ended a

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural

Excavation Unit

26

Location

2-x-2 meter grid unit 1369N 504E.
South east portion of site.
Directly west of Block 200 east midden.

Selection Criteria

Judgmental. To sample fill above Structure 220 and to identify Structure 220 outline.

Excavation Strategy

Natural strata.

Unit Ends at

Other. The purpose of Excavation Unit 26 was to identify the outline of Structure 220. Excavation Unit 26 was terminated when a portion of the southwest corner of Structure 220 was identified in the north half of the Excavation Unit. The remainder of Excavation

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural

Excavation Unit

27

Location

2-x-2 meter grid unit 1369N 506E.
Southeast portion of site.
Directly west of Block 200 east midden.

Selection Criteria

Judgmental. To sample fill above Structure 220 and to identify Structure 220 outline.

Excavation Strategy

Natural strata.

Unit Ends at

Other. The purpose of Excavation Unit 27 was to identify the outline of Structure 220. Excavation Unit 27 was terminated when a portion of the southern edge and antechamber of Structure 220 was identified in the north half of the Excavation Unit. The remainder o

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural

Excavation Unit

28

Location

2-x-2 meter grid unit 1369N 508E.
Southeast portion of site.
Directly west of Block 200 east midden.

Selection Criteria

Judgmental. To sample fill above Structure 220 and to identify Structure 220 outline.

Excavation Strategy

Natural strata.

Unit Ends at

Other. The purpose of Excavation Unit 28 was to identify the outline of Structure 220. Excavation Unit 28 was terminated when a portion of the southern edge and antechamber of Structure 220 was identified in most of the Excavation Unit. The remainder of Excavat

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural

Excavation Unit

29

Location

2-x-2 meter grid unit 1371N 502E.
Southeast portion of site.
Directly west of Block 200 east midden.

Selection Criteria

Judgmental. To sample fill above Structure 220 and to identify Structure 220 outline.

Excavation Strategy

Natural strata.

Unit Ends at

Fill continued. The purpose of Excavation Unit 29 was to identify the outline of Structure 220. Excavation Unit 29 was terminated when a portion of the southwest edge of Structure 220 was identified in the northeast half of the Excavation Unit. The remainder of Excavatio

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural

Excavation Unit

32

Location

2-x-2 meter grid unit 1371N 508E.
Southeast portion of site.
Directly west of Block 200 east midden.

Selection Criteria

Judgmental. To sample fill above Structure 220 and to identify Structure 220 outline.

Excavation Strategy

Natural strata.

Unit Ends at

Fill continued. The purpose of Excavation Unit 32 was to identify the outline of Structure 220-234. Excavation Unit 32 was terminated when prehistoric ground surface (Nonstructure 227) was encountered at 98.89 m in the very northeast portion of the unit. The rest of the

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural

Excavation Unit

33

Location

2-x-2 meter grid unit 1373N 502E.
Southeast portion of site.
Directly west of Block 200 east midden.

Selection Criteria

Judgmental. To sample fill above Structure 220 and to identify Structure 220 outline.

Excavation Strategy

Natural strata.

Unit Ends at

Fill continued. The purpose of Excavation Unit 33 was to identify the outline of Structure 220. Excavation Unit 33 was terminated when a portion of the northwest edge of Structure 220 was identified in the northwest half of the Excavation Unit. The remainder of Excavati

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural

Excavation Unit

35

Location

2-x-2 meter grid unit 1373N 506E.
Southeast portion of site.
Directly west of Block 200 east midden.

Selection Criteria

Judgmental. To sample fill above Structure 220 and to identify Structure 220 outline.

Excavation Strategy

Natural strata.

Unit Ends at

Fill continued. In the northeast corner of the unit, excavation was terminated on the prehistoric ground surface (Nonstructure 227) at an elevation of approximately 98.64 m. In the rest of the unit, fill continued into Structure 220.

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
202
not further specified
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural

Excavation Unit

149

Location

2-x-2 meter grid unit 1375N 504E.
Southeast quarter of the site.
Located in the northeast portion of Block 200; the southernmost portion of this unit is over Structure 220.

Selection Criteria

Judgmental. This unit was selected to test the area around Structures 220 and 234 and to determine their extent.

Excavation Strategy

Natural strata.

Unit Ends at

Undisturbed native sediment. Excavations ended on the prehistoric ground surface (Nonstructure 227) at an elevation of approximately 98.77 m.

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural

Excavation Unit

150

Location

2-x-2 meter grid unit 1375N 506E.
Southeast quarter of the site.
Located in the northeast quarter of Block 200, directly north of Structure 220.

Selection Criteria

Judgmental. This unit was selected to test the area around Structures 220 and 234 and to determine their extent.

Excavation Strategy

Natural strata.

Unit Ends at

Undisturbed native sediment. Excavations ended on the prehistoric ground surface (Nonstructure 227) at an elevation of approximately 98.75 m. Features 1 and 2 were dug into the prehistoric ground surface.

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural

Excavation Unit

151

Location

2-x-2 meter grid unit 1375N 508E.
Southeast quarter of the site.
Located in the northeast quarter of Block 200, directly northeast of Structures 220 and 234.

Selection Criteria

Judgmental. This unit was selected to test the area around Structures 220 and 234 and to determine their extent.

Excavation Strategy

Natural strata.

Unit Ends at

Undisturbed native sediment. Excavations ended on the prehistoric ground surface (Nonstructure 227) at an elevation of approximately 98.68 m.

Study Unit(s) Identified in this Excavation Unit

Study Unit Type
Study Unit Number
Study Unit Description
Arbitrary Unit
214
not further specified
Nonstructure
215
midden
Nonstructure
227
extramural surface
Arbitrary Unit
250
noncultural