Nonstructure 301, midden
About this Nonstructure
General Location
South-central portion of the site.
Specific Location
Southern portion of Architectural Block 300; south of Structures 302 and 303.
Selection Criteria
Fifteen 1-x-1-m units were randomly selected for excavation throughout Nonstructure 301 to sample midden deposits.
Use
Secondary refuse was deposited by nearby residents (Structures 302 and 303) during the Early Pueblo III period.
Abandonment
Pottery data indicates that refuse was not deposited after the Early Pueblo III period. There is a small quantity of Mesa Verde Black-on-white sherds.
Postabandonment Process
Natural sediments accumulated above the midden deposits.
Dating of Midden
Secondary refuse was deposited in this area during the Early Pueblo III period.
Date Range
11 (A.D. 11401180)
Site-Wide Dating
Excavation Details for Excavation Units
In order by excavation unit number.
Excavation Unit
24
Location
1-x-1 meter grid unit 419N 540E.
South-central portion of the site.
West-central portion of Nonstructure 301.
Selection Criteria
Random. Second 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
25
Location
1-x-1 meter grid unit 407N 549E.
South-central portion of the site.
Southwestern portion of Nonstructure 301.
Selection Criteria
Random. Third 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
26
Location
1-x-1 meter grid unit 417N 544E.
South-central portion of the site.
West-central portion of Nonstructure 301.
Selection Criteria
Random. Sixth 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
27
Location
1-x-1 meter grid unit 407N 553E.
South-central portion of the site.
South-central portion of Nonstructure 301.
Selection Criteria
Random. Seventh 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
28
Location
1-x-1 meter grid unit 414N 546E.
South-central portion of the site.
West-central portion of Nonstructure 301.
Selection Criteria
Random. Ninth 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
29
Location
1-x-1 meter grid unit 408N 549E.
South-central portion of the site.
Southwestern portion of Nonstructure 301.
Selection Criteria
Random. Tenth 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
30
Location
1-x-1 meter grid unit 413N 550E.
South-central portion of the site.
Southwestern portion of Nonstructure 301.
Selection Criteria
Random. Fourteenth 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
31
Location
1-x-1 meter grid unit 408N 564E.
South-central portion of the site.
South-eastern portion of Nonstructure 301.
Selection Criteria
Random. Fourth 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
32
Location
1-x-1 meter grid unit 413N 553E.
South-central portion of the site.
South-central portion of Nonstructure 301.
Selection Criteria
Random. Fifth 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
33
Location
1-x-1 meter grid unit 416N 561E.
South-central portion of the site.
East-central portion of Nonstructure 301.
Selection Criteria
Random. Eleventh 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
34
Location
1-x-1 meter grid unit 415N 561E.
South-central portion of the site.
East-central portion of Nonstructure 301.
Selection Criteria
Random. Thirteenth 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
35
Location
1-x-1 meter grid unit 421N 560E.
South-central portion of the site.
Northeastern portion of Nonstructure 301.
Selection Criteria
Random. Fifteenth 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
37
Location
1-x-1 meter grid unit 422N 545E.
South-central portion of the site.
North-western portion of Nonstructure 301.
Selection Criteria
Random. First 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
47
Location
1-x-1 meter grid unit 418N 554E.
South-central portion of the site.
North-central portion of Nonstructure 301.
Selection Criteria
Random. Eighth 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit
Excavation Unit
48
Location
1-x-1 meter grid unit 409N 557E.
South-central portion of the site.
South-central portion of Nonstructure 301.
Selection Criteria
Random. Twelfth 1-x-1-m unit randomly selected for excavation in Architectural Block 300.
Excavation Strategy
Arbitrary levels. Excavated in 10 cm levels.
Unit Ends at
Undisturbed native sediment.
Study Unit(s) Identified in this Excavation Unit