Nonstructure 3.2-N, extramural surface
No.
Interpretation
Construction
Remodeling
1
Ephemeral surface in fill that is associated with the construction of an extramural wall (Feature 1).
Not constructed; surface rests in secondary refuse (Stratum 2 in PD record, Stratum B on Map 173).
Not applicable.