Nonstructure 4.6-N, extramural surface
No.
Interpretation
Construction
Remodeling
2
Ephemeral outdoor surface in fill; associated with the construction of a wall (Feature 1).
Not constructed; surface rests on fill that contains secondary refuse (Nonstructure 4.1-N, Stratum 1 Level 1 in PD record; Stratum A on Map 218).
Not applicable.