Nonstructure 4.7-N, extramural surface
No.
Interpretation
Construction
Remodeling
3
Ephemeral outdoor surface in fill; associated with the construction of a possible pit feature (Feature 2).
Not constructed; rests on secondary refuse (Nonstructure 4.5-N).
Not applicable.