Nonstructure 8.3-N, extramural surface

No.

Interpretation

Construction

Remodeling

2

Ephemeral surface in fill that is associated with the construction of an extramural wall (Feature 2).

Not constructed; rests on secondary refuse (Stratum 2 in PD record; Stratum D on Map 150).

Not applicable.