Nonstructure 156, extramural surface
No.
Interpretation
Construction
Remodeling
1
Extramural use surface from which pit features were excavated.
Surface 1 was assigned to undisturbed native sediment from which Features 1 and 2 were excavated.
None.
No.
Interpretation
Construction
Remodeling
1
Extramural use surface from which pit features were excavated.
Surface 1 was assigned to undisturbed native sediment from which Features 1 and 2 were excavated.
None.