Nonstructure 125, extramural surface
No.
Interpretation
Construction
Remodeling
1
Ephemeral surface from which Feature 1 was excavated.
Surface 1 is an ephemeral surface from which Nonstructure 125, Feature 1 (Burial pit) was excavated.
None.
No.
Interpretation
Construction
Remodeling
1
Ephemeral surface from which Feature 1 was excavated.
Surface 1 is an ephemeral surface from which Nonstructure 125, Feature 1 (Burial pit) was excavated.
None.