Nonstructure 1000, extramural surface

No.

Interpretation

Construction

Remodeling

1

Prepared surface.

Field documentation unclear. Probably a prepared surface: packed adobe.

2

Prepared surface.

Not recorded, but on the basis of the field description of the underlying sediment (PDs 798, 803, 839), it is believed to have probably been the top of one or more layers of construction fill.

Another surface (Surface 1) was on top of this surface.

3

Not clear: surface is described in field notes as simply use-compacted, but the presence of underlying construction fill suggests that it may have been prepared.

Field documentation unclear: cannot tell whether surface was formally constructed or simply use-compacted.