Nonstructure 7-N, midden

No.

Interpretation

Construction

Remodeling

1

Ephemeral use surface in midden.

Surface consists of the top of a layer of ashy midden.

None.

2

Designed to level the area for construction of an extramural wall.

Constructed of 15 cm of red silt loam.

None.